期刊文献+

医院建设项目的BIM咨询制度应用 被引量:1

Application of BIM Consulting System in Hospital Construction Projects
下载PDF
导出
摘要 医院建设项目往往面临投资大、工期紧、要素复杂、涉及医疗专项多、施工工艺要求高等挑战,难以保证BIM技术的质量。通过引入BIM咨询制度,能够协助业主单位提高BIM技术应用效率,提升全生命周期BIM质量,加快项目进度,节约建造成本。 Hospital construction projects will encounter challenges such as large investment, tight construction period, complex elements, multiple medical facilities and high construction technology requirements, which makes it difficult to ensure the quality of BIM technology. The BIM consulting system can assist hospital business owners to enhance the application efficiency of BIM technology, improve the quality of BIM in the whole life cycle of the project, speed up the progress of the project, and save the construction cost.
作者 程思 黄新颖 Cheng Si;Huang Xinying(Fujian Gynaecology and Obstetrics Hospital,Fuzhou,350000)
机构地区 福建省妇产医院
出处 《建设科技》 2022年第17期66-69,共4页 Construction Science and Technology
关键词 医院 BIM 咨询 应用 hospital BIM consulting application
  • 相关文献

参考文献2

二级参考文献21

  • 1中华人民共和国国家统计局.房屋竣工面积和住宅房屋竣工面积(2013年)http://www.stats.gov.cn/,2011[EB/OL].中华人民共和国国家统计局网,2014-9-22.
  • 2Benjaoran V, Dawood N. Intelligence approach to pro- duction planning system for bespoke precast concrete products [ J ]. Automation in Construction, 2006, 15 (6) : 737-745.
  • 3Leu S S, Hwang S T. A GA-based model for maximizing precast plant production under resource constraints [ J].Engineering Optimization, 2001, 33(5): 619-642.
  • 4Ko C H, Wang S F. GA-based decision support systems for precast production planning [J]. Automation in Con- struction, 2010, 19(7) : 907-916.
  • 5Benjaoran V, Dawood N, Hobbs B. Flowshop scheduling model for bespoke precast concrete production planning [ J]. Construction Management and Economics, 2005, 23(1) : 93-105.
  • 6Wang L C, Lin S K. A multi-agent based agile manufac- turing planning and control system[J]. Computers & In- dustrial Engineering, 2009, 57(2): 620-640.
  • 7Sacks R, Eastman C M, Lee G. Process model perspec- tives on management and engineering procedures in the precast/prestressed concrete industry [ J ]. Journal of Construction Engineering and Management, 2004, 130 (2) : 206-215.
  • 8Lee G, Sacks R, Eastman C. Product data modeling u- sing GTPPM--A case study [ J]. Automation in Con- struetion, 2007, 16(3) : 392-407.
  • 9Lee G, Eastman C M, Sacks R. Eliciting information for product modeling using process modeling [ J ]. Data & Knowledge Engineering, 2007, 62 (2) : 292-307.
  • 10Sacks R, Eastman C M, Lee G. Information and process flow in models of precast concrete design and construction [ C] Proceedings of 3rd International Conference on Con- current Engineering in Construction. 2002.

共引文献9

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部