期刊文献+

S18线下穿G30高速公路立交施工方案简述

Brief Introduction of Construction Scheme of S18 Line Underpass G30 Expressway Interchange
下载PDF
导出
摘要 随着中国公路交通事业的发展,下穿和上跨高速公路的高等级公路越来越多,随之立交也越来越多,施工难度也越来越大。在不中断高速公路通行的情况下,安全问题就成了头等大事,施工方法也是多种多样,论文针对S18线下穿G30高速公路立交施工方案进行简述。 With the development of China’s highway transportation,there are more and more high-grade highways underpass and overpass expressways,along with more and more interchanges,and the construction is more and more difficult.In the case of no interruption of highway traffic,the safety problem has become the top priority,and the construction methods are also various,this paper briefly describes the construction scheme of S18 line underpass G30 expressway interchange.
作者 肖威 肖俊彦 Wei Xiao;Junyan Xiao(Zhangye Highway Bureau of Gansu Province,Zhangye,Gansu,734000,China)
出处 《工程设计与施工》 2020年第8期38-41,共4页 Engineering Design and Construction
关键词 高速公路 立交 施工方案 expressway interchange construction scheme
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部