摘要 1.Introduction to the project The Three Gorges Project is a key backbone project for the management and development of the Yangtze River.Its dam site is located in the middle section of the Xiling Gorge at the main stream of the Yangtze River,in Sandouping Town,Yichang City,Hubei Province,with a control basin area of about 1×10^(6)km^(2),an average annual flow of 14300 m^(3)·s^(-1),an average annual runoff of 4.51×10^(11) m^(3),a normal water level at an elevation(EL)of 175 m,and a corresponding reservoir capacity of 3.93×10^(10) m^(3).
作者 Xinqiang Niu
出处 《Engineering》 SCIE EI CAS 2022年第8期17-23,共7页 工程(英文)
关键词 YANGTZE RUNOFF BACKBONE
  • 相关文献

参考文献9

二级参考文献29

  • 1刘会娟,张建海,陆民安,任齐贵.3B坝段坝身孔洞洞周应力应变分析[J].广西水利水电,2004(B05):14-17. 被引量:2
  • 2吴剑疆.碾压混凝土坝防渗结构型式述评[J].水利技术监督,2005,13(1):52-55. 被引量:2
  • 3梁晓丹,刘刚,赵坚.地下工程压力拱拱体的确定与成拱分析[J].河海大学学报(自然科学版),2005,33(3):314-317. 被引量:71
  • 4朱伯芳.混凝土坝温度控制与防止裂缝的现状与展望[J].水利学报,2006,37(12):1424-1432. 被引量:102
  • 5钮新强,王小毛.三峡工程枢纽布置设计与研究[A].三峡工程设计论文集[C].北京:中国水利水电出版社,2003,8.
  • 6陆德源.三峡工程大坝及电站厂房研究.长江三峡工程技术丛书[M].武汉:湖北科学技术出版社,1997,10.
  • 7中华人民共和国行业标准编写组.SL266-2001水电站厂房设计规范[S].北京:中国水利水电出版社,2001.
  • 8Changjiang Institute of Survey, Planning, Design, and Research, Changjiang Water Resources Commission. Proceedings of the Design of Three Gorges Project [M]. Beijing: China Water Power Press, 2003.
  • 9Xie Xiufa, Chert Wenbin. Preparations for the Construction of TGP and the Design and Implementation of Equipments [ M ]. Wuhan : Changjiang Press, 2007.
  • 10Weng Yonghong, Xie Hongzhong, Xia Zhongping. Real-time Dynamic Simulation of Concrete Dam Construction [ M ]. Beijing : China Electric Press, 2003.