深远海复杂地质海况条件下风机安装工艺研究

Research on Installation Process of the Wind Turbine under Complex Geological and Sea Conditions in Deep Sea
下载PDF
导出
摘要 文章以广东省粤东某海上风电场项目的风机安装工作为例,考虑到此项目的深远海复杂地质海况条件,强调该施工条件下的风机安装工艺要重视安装工艺的针对性与适用性,包括船舶就位、起重船就位运输驳、起吊安装塔筒。成功规避了此项目复杂海况、软弱土层较厚的影响,还成功克服了复杂潮流与海浪对风机吊装船的影响,为类似复杂地质海况项目的风机安装提供参考。 Taking the wind turbine installation work of an offshore wind farm project in eastern Guangdong Province as an example, considering the complex geological and sea conditions in deep sea of the project, this paper emphasizes that the installation process of the wind turbine under this construction conditions should pay attention to the pertinence and applicability of the installation process, including the ship in place, the crane ship in place to transport barge,and the lifting and installation of the tower. The project successfully avoids the influence of complex sea conditions and thick soft soil layer, and successfully overcomes the influence of complex tidal currents and waves on the wind turbine hoisting ship, which provides references for wind turbine installation in projects with similar complex geological and sea conditions.
作者 王志刚 郭子生 冷平 张维坤 薛洪志 Wang Zhigang;Guo Zisheng;Leng Ping;Zhang Weikun;Xue Hongzhi(CGN New Energy Holdings Co.,Ltd.,Beijing 100071;Shanghai Electric Group Co.,Ltd.,Shanghai 200040;Shanghai Ouyang Offshore Engineering Group Co.,Ltd.,Shanghai 200434)
出处 《工程技术研究》 2022年第10期99-101,共3页 Engineering and Technological Research
关键词 复杂海况 风机 安装工艺 海上工程 complex sea conditions wind turbine installation process offshore engineering
  • 相关文献

参考文献6

二级参考文献41

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部