地铁车站抗拔桩设计与施工存在的问题及对策 被引量:1

Problems and Countermeasures in the Design and Construction of Uplift Piles in the Subway Station
下载PDF
导出
摘要 抗拔桩作为地铁车站永久结构的一部分,其设计使用年限为100年,是抵抗地铁车站在水浮力等外力作用下产生整体向上位移的主要构造措施。为此,文章结合地铁建设设计、施工工作经验,从桩型选择、承载力计算及影响因素、耐久性设计、可靠性设计四个方面对地铁车站抗拔桩设计问题,从试桩施工问题、施工质量控制问题两个方面对地铁车站抗拔桩施工问题进行了探讨。 As a part of permanent structure of the subway station, the uplift pile has a design life of 100 years, which is the main structural measure to resist the overall upward displacement of the subway station under the action of water buoyancy and other external forces. Therefore, combined with the subway construction design and construction work experience, this paper discusses the design of uplift pile in subway station from four aspects of pile type selection, bearing capacity calculation and influencing factors, durability design and reliability design, and discusses the construction of uplift pile in subway station from two aspects of test pile construction and construction quality control.
作者 杨辉 Yang Hui(Hangzhou Metro Group Co.,Ltd.,Hangzhou,Zhejiang 310021)
出处 《工程技术研究》 2022年第10期224-226,共3页 Engineering and Technological Research
关键词 地铁车站 抗拔桩 施工质量控制 subway station uplift piles construction quality control
  • 相关文献

参考文献3

二级参考文献31

共引文献7

同被引文献13

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部