摘要
湖北咸宁地区岩土层种类较多,分布复杂多变,局部地区可见溶洞、土洞发育现象,对工程施工具有相当隐患,正确分析评价场地工程地质条件是后续设计施工的有力保证。文章介绍了咸宁金融信息港(一期)信息交流中心建设项目工程场地地质条件,对项目场地及周边自然地貌、地质构造做了详细论述,通过对场地各岩土层分布特点、不良地质及特殊性岩土、地表及地下水、场地地震等的分析与评价,对工程场地进行了稳定性、适宜性和均匀性评价,并对场地地基及基础持力层的选择给出了合理建议,可为该地区工程建设提供参考依据。
There are many types of rock and soil layers in Xianning, Hubei Province, and the distribution is complex and changeable. Karst caves and soil caves can be seen in some areas, which poses considerable hidden dangers to engineering construction. The correct analysis and evaluation of the geological conditions of the site engineering is a strong guarantee for the subsequent design and construction.This paper introduces the geological conditions of the construction project site of Xianning Financial Information Port( Phase I) Information Exchange Center, and discusses the project site and its surrounding natural landform and geological structure in detail. Through the analysis and evaluation of the distribution characteristics of each rock and soil layer, adverse geology and special geotechnical, surface and groundwater, site earthquakes, etc., the stability, suitability and uniformity of the project site are evaluated, and reasonable suggestions are given for the selection of site foundation and foundation bearing layer, which can provide references for engineering construction in this area.
作者
孔莹
Kong Ying(Central South Architectural Design Institute Co.,Ltd.,Wuhan,Hubei 430061)
出处
《工程技术研究》
2022年第11期223-226,共4页
Engineering and Technological Research
关键词
工程地质条件
地质条件评价
地基基础评价
engineering geological conditions
geological conditions evaluation
foundation evaluation