The On-site Verification of Key Technologies for Kunbei-Liuzhou-Longmen Hybrid Multi-terminal Ultra HVDC Project 被引量:3

原文传递
导出
摘要 Hybrid high voltage direct current transmission(Hybrid HVDC)is a new type of HVDC technology developed in recent years.It combines the characteristics of large-capacity and low cost of the line commutated converters(LCC)and non-commutation failure and dynamic reactive power support of voltage sourced converters(VSCs)in one HVDC system.It has technical advantages in the fields of unidirectional power transmission and in the application of improving the stability of multi-infeed HVDCs,giving it broad application prospects.The Kunbei-Liuzhou-Longmen(KBL)project is the first hybrid ultra HVDC project.It was put into service on Dec.27th,2020.This paper introduces the KBL project,analyzes the operation characteristics of hybrid HVDC system,and provides on-site verification of KBL project,including operation of LCC-VSC hybrid system,ultra-high voltage VSC technology using the series of two valve groups,the DC fault ride-though of hybrid VSC without using DC breaker,the connection and disconnection of a third station,and etc.
出处 《CSEE Journal of Power and Energy Systems》 SCIE EI CSCD 2022年第5期1281-1289,共9页 中国电机工程学会电力与能源系统学报(英文)
基金 This work was supported by CSG project(KYKJXM20210204).
  • 相关文献

参考文献6

二级参考文献95

共引文献830

同被引文献20

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部