摘要
方舱医院的建设周期短、功能性要求高、设计施工需同步,对施工企业提出了极高的要求。为此,基于工程实施经验,对施工企业在人员、机具、物资、技术、场地、对外联络等方面需进行的准备工作进行了详细梳理,以期为类似工程提供借鉴。
The construction period of the shelter hospital is short,the functional requirements are high,the design and construction need to be synchronized,which puts forward high requirements for the construction enterprises.Therefore,based on the project implementation experience,the preparation work required by the construction enterprise in terms of personnel,equipment,materials,technology,jobsite,external contact and so on has be sorted out in detail,in order to provide reference for similar projects.
作者
潘峰
黄泽志
王晓旻
PAN Feng;HUANG Zezhi;WANG Xiaomin(Shanghai Construction No.5(Group)Co.,Ltd.,Shanghai 200063,China)
出处
《建筑施工》
2022年第9期2021-2023,共3页
Building Construction
关键词
方舱医院
改建
施工准备
难点
要点
shelter hospital
reconstruction
construction preparation
difficult points
key points