改建型方舱医院施工准备要点概述 被引量:2

Summary of Key Points for Construction Preparation of Reconstructed Shelter Hospital
下载PDF
导出
摘要 方舱医院的建设周期短、功能性要求高、设计施工需同步,对施工企业提出了极高的要求。为此,基于工程实施经验,对施工企业在人员、机具、物资、技术、场地、对外联络等方面需进行的准备工作进行了详细梳理,以期为类似工程提供借鉴。 The construction period of the shelter hospital is short,the functional requirements are high,the design and construction need to be synchronized,which puts forward high requirements for the construction enterprises.Therefore,based on the project implementation experience,the preparation work required by the construction enterprise in terms of personnel,equipment,materials,technology,jobsite,external contact and so on has be sorted out in detail,in order to provide reference for similar projects.
作者 潘峰 黄泽志 王晓旻 PAN Feng;HUANG Zezhi;WANG Xiaomin(Shanghai Construction No.5(Group)Co.,Ltd.,Shanghai 200063,China)
出处 《建筑施工》 2022年第9期2021-2023,共3页 Building Construction
关键词 方舱医院 改建 施工准备 难点 要点 shelter hospital reconstruction construction preparation difficult points key points
  • 相关文献

参考文献3

二级参考文献22

共引文献93

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部