摘要
在某项目钢筋桁架楼承板的施工过程中,发现在钢筋桁架楼承板的运用及质量控制方面,可参考的国家级及建筑行业权威性操作规范和验收标准较少。在该项目实施过程中,通过工程实践和不断地总结完善,汇总形成了一套较为完整的钢筋桁架楼承板施工工艺。
Through construction of steel truss floor bearing plates in a project,it is found that there are few authoritative national or building industry operating codes and acceptance standards for reference in the application and quality control of steel truss floor bearing plates in the overall construction process.During project implementation,a relatively complete set of steel truss floor bearing plate construction process has been formed through practice and continuous summarization and improvement.
作者
李国华
LI Guo-hua(Gansu Jiantou Fourth Construction Group Co.,Ltd.,Lanzhou Gansu 730060,China)
出处
《化肥设计》
CAS
2022年第5期52-55,共4页
Chemical Fertilizer Design
关键词
钢筋桁架楼承板
施工工艺
控制要点
steel truss floor bearing plate
construction process
control point