摘要
为防止恶性投标竞争带来的投资风险,提高投资效益,合理确定和有效控制水利水电工程基本建设项目投资,招标项目往往需要编制最高投标限价。文章分析了水利水电工程最高投标限价编制的重点,总结归纳了编制原则、依据及方法,以此提高最高投标限价编制的质量。只有客观、合理地确定最高投标限价,才能有效管控工程投资,真正发挥应有的作用,提高发承包交易的成功率,也有利于维护招标人和投标人的合法权益。
In order to prevent the investment risk caused by vicious bidding competition, improve the investment benefit, reasonably determine and effectively control the investment of water conservancy and hydropower project, the bidding project often needs to compile the maximum bid price. This paper analyzes the key points of the compilation of maximum bid price for water conservancy and hydropower project, summarizes the compilation principle, basis and method, so as to improve the quality of the compilation of maximum bid price. Only objective and reasonable determination of the maximum bid price can effectively control the project investment, really play its due role, improve the success rate of contract transaction, and be conducive to the maintenance of the legitimate rights and interests of tenderee and bidder.
作者
王勤学
李卓玉
WANG Qinxue;LI Zhuoyu(China Renewable Energy Engineering Institute,MWR,Beijing 100120,China)
出处
《中国水能及电气化》
2022年第10期68-70,67,共4页
China Water Power & Electrification
关键词
水利水电工程
最高投标限价
编制重点
编制方法
water conservancy and hydropower project
maximum bid price
key point of compilation
compilation method