期刊文献+

龙塘水闸枢纽生态鱼道过鱼孔断面设计优化

Optimization of fish hole cross-section design for ecological fish way of Longtang Sluice Complex
下载PDF
导出
摘要 介绍了龙塘水闸枢纽工程生态鱼道工程的局部水工模型试验。主要目的为研究鱼道过鱼孔断面设计的合理性,并在初步设计方案的基础上进行调整和优化,为鱼道整体模型试验及鱼道设计提供支撑。 An introduction was made on the local hydraulic model test for the ecological fish way structure of Longtang Sluice Complex. The test was carried out mainly for study of the rationality of fish hole cross-section design, adjustment and optimization of the preliminary design scheme, providing support for overall model test and design of fish way.
作者 熊晖 李小五 黄康鑫 XIONG Hui;LI Xiao-wu;HUANG Kang-xin(China Water Resources Pearl River Planning,Surveying and Designing Co.,Ltd.,Guangzhou 510610,China;Guangxi Water&Power Design Institute Co.,Ltd,Nanning 530023,China)
出处 《广西水利水电》 2022年第5期47-51,共5页 Guangxi Water Resources & Hydropower Engineering
关键词 生态鱼道工程 水工模型试验 过鱼孔断面设计 龙塘水闸枢纽 Ecological fish way structure hydraulic model test fish hole cross-section design Longtang Sluice Complex
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部