摘要
重点围绕上闸首的检修门、工作门的门型、设计方案、门槽形式、计算结果等,介绍长洲水利枢纽工程1号船闸上闸首金属结构设计。收集整理启闭机的相关参数和对设计参数进行复核校验的结果,对设计特点进行归纳分析。
An introduction was made on the design of upper head metal work for No.1 ship lock of Changzhou Hydraulic Complex, including the types, design schemes, gate slots and calculation results of bulkhead gate and service gate etc. Relevant parameters of hoist were collected and the design parameters were rechecked. The design characteristics were also summarized and analyzed.
作者
季锐
孙娜
JI Rui;SUN Na(Guangxi Vocational College of Water Resources and Electric Power,Nanning 530023,China;China Energy Engineering Group Guangxi Electric Power Design Institute Co.,Ltd.,Nanning 530023,China)
出处
《广西水利水电》
2022年第5期52-55,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
1号船闸
上闸首
金属结构
闸门
启闭机
长洲水利枢纽
No.1 ship lock
upper lock head
metal work
gate
hoist
Changzhou Hydraulic Complex