摘要
核电设备采购管理是确保设备设计合理转化为完美体现设计意图的实物产品的核心步骤之一,也是连接设计方、设备供应方和业主(营运单位)方的主要活动接口,更是确保核电项目最终建造质量的重要环节之一。只有核电设备采购管理到位,核电项目执行进度及经费支出才能达到合理预期。本文对核电设备采购管理工作做了初步总结和探讨,通过对核电设备采购管理过程的阐述和分析,提出了核电设备采购管理中普遍存在的一些问题,并给出了问题处理的初步建议。
Nuclear power equipment procurement management is one of the core steps to ensure that the full equipment design intent is perfectly transformed into real products,and it is the main interface between the designer,equipment supplier and the owner of the operating unit.Especially,it is one of the most important processes to ensure the final construction quality of nuclear power projects.If the procurement management of nuclear power equipment is in place,the progress and the expenditure of nuclear power project can be in line with expectations.This paper makes a preliminary summary and discussion on the procurement management of nuclear power equipment.Through the elaboration and analysis of the procurement management process of nuclear power equipment,it puts forward some common problems existing in the procurement management of nuclear power equipment.Also,it gives some preliminary suggestions on how to deal with the problems.
作者
张子睿
Zhang Zirui(China Nuclear Power Engineering Co.Ltd,Beijing 100840,China)
出处
《核安全》
2022年第5期95-101,共7页
Nuclear Safety
关键词
核电
设备采购
管理
nuclear power
equipment procurement
management