摘要
张拉作为箱梁施工最为关键的工序之一,其施工质量决定着箱梁的建设质量。如若现场施工管理缺位、施工作业欠规范,极易导致张拉力不足或过量、伸长量超标或过少、钢绞线断丝或滑丝等诸多问题。因此,切实抓好箱梁张拉施工要点、把好质量关、落实规范施工极为关键。对此,文章以某城市快速路主线桥箱梁张拉施工为例,就后张法预应力混凝土连续箱梁张拉施工要点予以探讨,以期为众桥梁施工同仁提供参考。
Tension is one of the key processes in box girder construction and its construction quality determines the construction quality of box girder.If the on-site construction management is absent and the construction operation is not standardized,it is very easy to cause many problems such as insufficient or excessive tension,excessive or too little elongation,broken wire or sliding wire of steel strand Therefore,it is very important to do a good job in the construction of box girder tension,quality control and standardized construction.Therefore,this paper discusses the key points of post stressed concrete continuous box girder tensioning construction by taking the box girder tensioning construction of the main bridge of a city expressway as an example,in order to provide reference for bridge construction colleagues.
作者
董磊
Dong Lei(Anhui Sanjian Engineering CO.LTD.,Hefei 230001,China)
出处
《河南水利与南水北调》
2022年第8期49-50,共2页
Henan Water Resources & South-to-North Water Diversion
关键词
后张法
预应力连续箱梁
张拉施工
施工要点
post-tensioned method
prestressed continuous box girder
tension construction
the main points of construction