期刊文献+

小浪底南岸灌区负图水库改建措施

Reconstruction Measures of Futu Reservoir in Xiaolangdi South Bank Irrigation Area
原文传递
导出
摘要 小浪底南岸灌区工程范围为西起孟津县西部边界和金水河,北临黄河和孟津县黄河渠,南到洛阳市洛河二级阶地,东到巩义市伊洛河界。工程设计灌溉面积3.58万hm^(2),向孟津县城供水1887万m^(3),向巩义市城镇供水177万m^(3)。该项目建筑物通过新建、续建、改建和利用完建各级渠道完成灌区渠系工程设计,其中负图水库扩容改造总调蓄水量285万m^(3)。 The south bank of Xiaolangdi Irrigation Area scope for the west boundary of Mengjin County and Jinshui River,north of the Yellow River and the Yellow River Canal in Mengjin County,south to the secondary terrace of Luo River in Luoyang City,east to the Yiluo River boundary in Gongyi City.The designed irrigation area of the project is 35,800 hm^(2),and the water supply to Mengjin county is 18.87 million m^(3),and to Gongyi City is 1.77 million m^(3).The buildings of the project has completed the design of the irrigation area through the construction,renewal,reconstruction and utilization channels,among which the total storage capacity of the negative map reservoir is 2.85 million m^(3).
作者 张银涛 郭立新 毛海辰 蔡义华 ZHANG Yintao;GUO Lixin;MAO Haichen;CAI Yihua(Pingdingshan Water Conservancy Project Quality Testing Station,Pingdingshan 467000,China;Henan Luhun Reservoir Administration Bureau,Luoyang 471003,China;Lingbao Water Resources Bureau,Lingbao 472500,China;Shangqiu Liangyuan District Water Resources Bureau,Shangqiu 476000,China)
出处 《河南水利与南水北调》 2022年第8期107-108,共2页 Henan Water Resources & South-to-North Water Diversion
关键词 灌区 建筑物 调蓄工程 负图水库 irrigation area buildings regulation and storage project Futu Reservoir
  • 相关文献

参考文献2

二级参考文献4

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部