预应力张弦桁架滑移及拉索张拉施工技术研究 被引量:4

RESEARCH ON PRESTRESSED STRING TRUSS SLIDING AND CABLE STRETCHING TECHNIQUES
下载PDF
导出
摘要 以某干煤棚为例,对桁架滑移过程中滑移轨道、滑移动力与不同步顶推滑移进行设计与验证。结果表明,滑移方案具有可行性与安全性。拉索张拉采用超张拉法施工,确定出各拉索超张拉值,验证了拉索超张拉施工可保证桁架监测点竖向位移与架单元应力满足要求,阐述了桁架卸载时支座构造与加固措施,可为类似工程提供借鉴。 This paper took a dry coal shed as an example to design and verify sliding track,sliding force and asynchronous jacking sliding in truss sliding construction. It was found that the sliding scheme is feasible and safe. Over-stretching method was adopted to determine the over-stretching values of each cable, verify that over-stretching construction could guarantee acceptable longitudinal displacement and unit stress at monitoring point. Base structure and reinforcement measures for truss dismantlement were introduced to provide references for similar projects.
作者 边广生 尚彦宾 BIAN Guang-sheng;SHANG Yan-bin(School of Civil Engineering,Shandong Jian zhu University,250101,Jinan,China)
出处 《建筑技术》 2022年第10期1405-1408,共4页 Architecture Technology
关键词 预应力张弦桁架 桁架滑移 拉索张拉 桁架卸载 prestressed string truss truss slide cable stretching truss dismantlement
  • 相关文献

参考文献1

二级参考文献2

共引文献11

同被引文献28

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部