期刊文献+

地铁车辆段装配式结构形式研究 被引量:1

Research on Assembly Structure Form of Metro Depot
下载PDF
导出
摘要 地铁车站配套建筑,如车辆段、停车场等装配式应用率低,未形成大规模的预制构件装配式应用。针对这一情况,从地铁车辆段建筑入手,对地铁车辆段建筑大规模应用装配式进行了适用性探索和研究,同时对关键性的预制构件节点进行了试验模拟。以某在建地铁车辆段为试验对象,最终研究探索出了适用于地铁车辆段和停车场的装配式结构。 The supporting buildings of the subway station, such as depots and parking lots, etc. have a low assembly application rate, and there is no large-scale assembly application of prefabricated components. In view of this situation, starting with the subway depot buildings, the applicability of the large-scale application assembly of the subway depot buildings was studied and explored, and the key prefabricated component nodes were simulated and tested. Finally, the assembly structure and key nodes suitable for subway depot and parking lot have been successfully studied and explored by taking a subway depot under construction as the testing object.
作者 张宏亮 高耀 李志强 尹俊 ZHANG Hongliang;GAO Yao;LI Zhiqiang;YIN Jun(The Fifth Construction Co.,Ltd.of China Railway Construction Engineering Group,Guangzhou,Guangdong 511400,China)
出处 《施工技术(中英文)》 CAS 2022年第19期93-96,共4页 Construction Technology
基金 中国中铁股份有限公司科技计划项目(2020-重大-12)。
关键词 地铁车站 车辆段 停车场 装配式 结构 subway stations sepot parking lot assembly structure
  • 相关文献

参考文献6

二级参考文献23

共引文献42

同被引文献13

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部