摘要 双河500 kV变电站需要进行增容改造、更换500 kV构架导线,根据现行导线荷载和规范要求对500 kV构架进行复核计算。针对构架柱受力不满足规范要求这一情况,根据钢管混凝土原理采用构架柱内灌混凝土的加固设计方案和高位抛落不振捣法的施工方案。通过复核计算,构架柱内灌混凝土的加固设计方案能够提高构架柱的受力性能,既可满足工程要求,又节省了停电时间。 The Shuanghe 500 kV substation plans to carry out the reconstruction to increase the power capacity.The 500 kV truss is rechecked and calculated according to the current conductor load and specification requirements.Aiming at the situation that the force of the truss column does not meet the requirements of the specification,basing on the principle of concrete-filled steel tube,the filling concrete reinforcement method and construction scheme of high-position drop without vibrating method are proposed.Through rechecking calculations,the filling concrete reinforcement method will significantly improve the mechanical performance of the truss column,which not only meets engineering requirements,but also shorts power outage time.
作者 鲁伟 吴必华 闫勇 吴晟 余欢 LU Wei;WU Bihua;YAN Yong;WU Sheng;YU Huan(Central Southern China Electric Power Design Institute Co.,Ltd.of China Power Engineering Consulting Group,Wuhan 430071,China)
出处 《电力勘测设计》 2022年第10期60-63,69,共5页 Electric Power Survey & Design
关键词 500kV构架 加固设计 混凝土 500 kV truss reinforcement design concrete filled steel tube
  • 相关文献

参考文献2

二级参考文献2

  • 1变电构架设计手册[M].武汉:湖北科学技术出版社,2006.
  • 2建筑施工计算手册(第5版)[M].北京:中国建筑工业出版社,2012.

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部