摘要
介绍了500 m长钢轨铺设施工后预留轨缝发生变化的情况,分析了预留轨缝的分析和计算方法。该方法可避免低温条件下引起的钢轨收缩不超过构造轨缝,高温条件下预留轨缝的两头钢轨不严顶,有效通过预留轨缝,减少后期养护工作和确保安全行车。
This pape introduces the 500 m long steel rail laying construction after the pre-set rail joints change,analysis of the pre-set rail joints analysis and calculation method.The method can avoid the low temperature conditions caused by the rail shrinkage does not exceed the construction rail joints,high temperature conditions reserved rail joints of the two ends of the rail is not strict top,effective through the reserved rail joints,reduce the late maintenance work and ensure safe traffic.
作者
张国平
Zhang Guoping(China Railway 17th Bureau Group Electrification Engineering Co.,Ltd.,Taiyuan Shanxi 030032)
出处
《现代工业经济和信息化》
2022年第9期310-311,共2页
Modern Industrial Economy and Informationization
关键词
铺设500
m长钢轨
预留轨缝
计算方法
laying 500 m long rail
reserved rail seam
calculation method