期刊文献+

某金矿选矿工艺试验研究 被引量:3

Experimental research on the ore-dressing process in a gold mine
下载PDF
导出
摘要 某金矿石中可供回收的有价元素为金,品位为1.78 g/t,现场生产流程为全泥氰化浸出工艺,为解决矿山面临的环保压力,实现清洁生产,探索新的选矿工艺替代现有全泥氰化浸出工艺。在工艺矿物学研究基础上,通过单一浮选、重选+浮选选矿工艺流程对比,确定采用重选+浮选工艺流程。结果表明:重选+浮选工艺流程获得的重选精矿金品位3034.60 g/t,浮选精矿金品位16.85 g/t,重选+浮选金总回收率94.80%,金回收指标与现场全泥氰化浸出工艺指标相当。对浮选精矿进行金硫分离探索试验,获得了金品位68.25 g/t、金作业回收率84.95%的金精矿,硫品位42.21%、含金3.25 g/t的硫精矿。研究结果为同类矿山实现清洁生产提供了参考借鉴。 The content of the recoverable valuable element is gold in a gold ore and the grade is 1.78 g/t.The on-site production process is all-sliming cyanide leaching process.To solve the pressure of environmental protection challenges faced by the mine and realize green production,new ore-dressing processes are explored to replace the existing all-sliming cyanide leaching process.Based on process mineralogy research,the process flows of single flotation and gravity separation+flotation were compared,and the latter was chosen.The test results show that the gravity separation+flotation process obtained the gravity concentrate gold grade 3034.60 g/t,flotation concentrate gold grade 16.85 g/t,and the gold total recovery of gravity separation and flotation is 94.80%.The gold recovery index of gravity separation+flotation process is similar to that of the on-site all-sliming cyanide leaching process.A gold concentrate with a gold grade of 68.25 g/t and gold recovery rate of 84.95%and a sulfur concentrate with a sulfur grade of 42.21%and gold content of 3.25 g/t were obtained by an experimental study on gold and sulfur separation of flotation gold concentrate.The research result provides some references for similar mines to realize green production.
作者 梁泽来 Liang Zelai(Liaoning Jinfeng Gold Mining Industry Co.,Ltd.)
出处 《黄金》 CAS 2022年第10期78-81,共4页 Gold
关键词 金矿 重选 浮选 金硫分离 全泥氰化 gold mine gravity separation flotation gold and sulfur separation all-sliming cyanidation
  • 相关文献

参考文献9

二级参考文献59

共引文献49

同被引文献20

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部