电力工程变电站一次设备安装调试与安装施工分析 被引量:2

Installation Commissioning and Installation Construction Analysis of Primary Equipment in Electric Power Engineering Substations
下载PDF
导出
摘要 变电站是电力系统的重要组成部分,发挥着支撑电网运行的重要作用。在变电站中,一次设备主要用于直接生产使用电能,其运行质量将直接影响供配电质效。为此,本文从源头着手,以保障变电站一次设备安装、调试质量为目标,对电力工程变电站一次设备安装施工要点加以探讨。文章先分析一次设备的功能及作用,然后阐述设备安装施工要点与安装调试质量保障措施,以供相关人员参考借鉴。 The substation is an important part of the electric power system and plays an important role in supporting the operation of the power grid.In a substation,primary equipment is mainly used to directly produce and use electric energy,and its operation quality will directly affect the quality and efficiency of power supply and distribution.Therefore,this paper starts from the source,follows the goal of ensuring the installation and commissioning quality of primary equipment in substations,and discusses the main points of installation and construction of primary equipment in electric power engineering substations.The article first analyzes the function and effect of primary equipment,and then expounds the key points of equipment installation construction and the quality assurance measures for installation commissioning,for the reference of relevant personnel.
作者 奚俊 Xi Jun(Shanghai Dongjie Construction(Group)Co.,Ltd.,Shanghai 200120,China)
出处 《科学与信息化》 2022年第20期120-122,共3页 Technology and Information
关键词 一次设备 变电站 设备安装 设备调试 质量控制 primary equipment substation equipment installation equipment debugging quality control
  • 相关文献

参考文献3

二级参考文献11

共引文献11

同被引文献7

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部