期刊文献+

基于CASS的方格网法和DTM法土方量计算比对与分析

Comparison and Analysis of Earthwork Calculation between Grid Method and DTM Method Based on CASS
下载PDF
导出
摘要 工程建设过程中常常需要获得准确的土方量,比较和分析了CASS软件中方格网法和DTM法计算土方量的精度随不同参数(方格宽度和边界采样间距)设置的变化情况,计算结果表明,随着方格宽度的增加,方格网法计算土方量的偏差迅速增大,而DTM法受边界采样距离的影响较小,结果可为不同工程条件的土方量计算提供依据。 The calculation of earthwork is a common work in project construction.This paper compares and analyzes the calculation of earthwork derived from grid method and DTM method by setting different parameters(grid width and boundary sampling interval)based on CASS software.The results show that the bias of earthwork derived from gird method increases quickly with the increase of grid width,while DTM method is less impacted by the boundary sampling interval.The results of the study provides basis for calculating earthwork in different project conditions.
作者 陈安平 李红伟 CHEN Anping;LI Hongwei(Geology Surveying and Mapping Institute of Guangdong,510800,Guangzhou,PRC;South China Agricultural University,510640,Guangzhou,PRC)
出处 《江西科学》 2022年第5期906-908,927,共4页 Jiangxi Science
关键词 南方CASS 土方量 方格网法 DTM法 CASS earthwork grid method DTM method
  • 相关文献

参考文献8

二级参考文献29

共引文献107

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部