摘要
依托张北至雄安1 000 kV特高压交流输变电工程线路工程,分析了装配式架线前期数据的测量,并提出了一种精准测量导线长度的方法,为以后装配式架线导线预制件的制作提供一些思路。
This paper is based on the line project of Zhangbei-Xiongan 1000kV UHV AC power transmission and transformation project to analyze the data measurement of prefabricated stringing,and then puts forward a method to accurately measure conductor length,which provides some ideas for the production of prefabricated stringing in the future.
作者
边天元
王志远
王鹏
张健博
BIAN Tianyuan;WANG Zhiyuan;WANG Peng;ZHANG Jianbo(Beijing Transmission and Transformation Co.,Ltd.,Beijing 102488,China)
出处
《湖北电力》
2022年第4期95-100,共6页
Hubei Electric Power
关键词
能源互联网
特高压
八分裂导线
多分裂导线
特高压交流输变电工程
1000
kV
导线精准测量
预制件
energy internet
extra-high voltage
eight-bundle conductor
muli-split conductor
UHV AC power transmission and transformation project
1000 kV
precise wire measurement
prefabricated member