期刊文献+

石角咀水闸枢纽布置方案研究 被引量:1

Research on Layout Scheme of Shijiaozui Sluice Project
下载PDF
导出
摘要 工程布置是工程设计中最基本也是最重要的组成部分,工程布置是否合理影响到工程施工、投资、运行管理等,甚至影响工程的可行性[1]和功能发挥[2]。该文结合石角咀水闸的地理位置、水系特征、相关功能,对水闸枢纽的总体布置方案进行研究,确保发挥挡潮、排水、御咸、航运和交通等多重功能,可供类似工程参考。 Project layout is the most basic and important part of project design.Whether the project layout is reasonable affects the project construction,investment,operation management,and even the feasibility and function of the project.Combined with the geographical location,water system characteristics and related functions of shijiaozui sluice,this paper studies the general layout scheme of the sluice hub to ensure the multiple functions of tide retaining,drainage,salt control,shipping and transportation,which can be used as a reference for similar projects.
作者 贺小康 HE Xiaokang(Guangdong Hydropower Planning&Design Institute Co.,Ltd.,Guangzhou 510635,China)
出处 《广东水利水电》 2022年第10期19-24,29,共7页 Guangdong Water Resources and Hydropower
关键词 水闸枢纽 布置方案 闸桥临建 sluice junction layout scheme temporary construction of gate and bridge
  • 相关文献

参考文献7

二级参考文献28

共引文献12

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部