有轨电车综合联调的组织和实施

Organization and Implementation of Tram Integrated Joint Commissioning
下载PDF
导出
摘要 有轨电车综合联调是在初期运营安全评估前对前期建设成果不可或缺的检验方式,直接关系到线路开通后的安全运营和关键运营服务指标能否达标。介绍了有轨电车综合联调筹备工作内容、综合联调组织实施内容、综合联调问题跟踪处理方式,分析了综合联调组织工作的特点,提出了完善综合联调组织工作的建议。 The integrated joint commissioning(JC)of tram is an indispensable test method for the early construction achievements before the initial operation safety assessment,which is directly related to the safe operation after the line is opened and whether the key operation service indicators can meet the standards.With an introduction to the contents of preparatory work for tram integrated JC,the contents of organization and implementation of the integrated JC,and the tracking and handling methods of problems in the integrated JC,the characteristics of organization work of the integrated JC are analyzed,suggestions to improve organization of tram integrated JC are put forward.
作者 张灿明 ZHANG Canming(Shanghai Keolis Public Transport Operation Management Co.,Ltd.,200070,Shanghai,China)
出处 《城市轨道交通研究》 北大核心 2022年第S01期90-93,共4页 Urban Mass Transit
关键词 有轨电车 综合联调 组织实施 tram joint commissioning organization and implementation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部