摘要
通过对卡拉奇K-2/K-3核电项目核岛人员通行厂房空调冷冻水系统的设计现状分析,总结了对应的改进措施,为后续的核岛人员通行厂房或其它同类型的空调冷冻水系统提供了不同的设计思路。
Based on the analysis of the design status of the air-conditioning chilled water system in the personnel access plant of Karachi K-2/K-3 nuclear power project, the corresponding improvement measures are summarized. It provides different design ideas for the subsequent personnel access plant of nuclear island or other similar air-conditioning chilled water system.
作者
史淼
SHI Miao(China National Nuclear Corporation Overseas Ltd.)
出处
《建筑热能通风空调》
2022年第9期53-55,共3页
Building Energy & Environment
关键词
核岛
系统优化
定流量
变流量
nuclear island
system optimization
constant flow
variable flow