根据南俄4项目施工的实际情况,对碳质板岩类的软岩特性及其变形原因进行了分析,阐述了水工隧洞中碳质板岩在一期开挖支护过程中针对变形采取的施工处理措施,所取得的经验可为后续类似工程提供借鉴和参考。
Combined with the actual construction situation of Nam Ngum 4 Project,this paper analyzed the soft carbonaceous slate characteristics and the causes of deformation,and elaborately introduced the construction treatment measures for carbonaceous slate deformation in the first stage excavation and support process of hydraulic tunnel,so as to provide reference for subsequent similar projects.
作者
黄炜
芶仕文
杨建明
刘建伟
王阳
HUANG Wei;GOU Shiwen;YANG Jianming;LIU Jianwei;WANG Yang(Laos Sub-company of Sinohydro Bureau 10 Co.,Ltd.,Chengdu,Sichuan,610037)
出处
《四川水力发电》
2022年第5期41-43,53,共4页
Sichuan Hydropower
关键词
水工隧洞
碳质板岩
软岩
变形
处理措施
南俄4水电站
hydraulic tunnel
carbonaceous slate
soft rock
deformation
treatment measure
Laos Nam Ngum 4 Hydropower Station