期刊文献+

基于Revit二次开发的船闸工程BIM模型钢筋算量技术 被引量:5

Reinforcement calculation technology of BIM model for ship lock project based on secondary development in Revit
下载PDF
导出
摘要 针对三维BIM软件Revit的船闸工程钢筋算量的针对性不强、操作复杂等问题,基于Revit软件二次开发实现了钢筋工程的自动快速算量,进行二次开发插件算量与Revit的钢筋算量的对比分析,并依托某船闸工程进行应用验证。结果表明,基于Revit二次开发的钢筋算量插件,解决了Revit的船闸工程钢筋算量针对性不强、操作复杂等问题,同时保证了钢筋算量的准确度,并且该插件在船闸工程中的适用性也较强,在一定程度上解决了船闸工程钢筋算量的难点。 This paper aims to address the problems of poor pertinence and complex operation facing reinforcement calculation for ship lock projects by the 3 D building information modeling(BIM)software Revit. Specifically, it achieves automatic and rapid calculation of reinforcement projects by secondary development in the software Revit, comparatively analyzes the calculation by the secondarily developed plug-in and reinforcement calculation by Revit, and verifies the application of the proposed plug-in with a ship lock project. The results show that the reinforcement calculation plug-in obtained by secondary development in Revit solves the problems of reinforcement calculation for ship lock projects by Revit, such as poor pertinence and complex operation. It also ensures the accuracy of reinforcement calculation and has wide applicability in ship lock projects. To a certain extent, it solves the difficulty in reinforcement calculation in ship lock projects.
作者 侯立俊 李为 张金峰 汪志勇 袁占全 向羽 HOU Li-jun;LI Wei;ZHANG Jin-feng;WANG Zhi-yong;YUAN Zhan-quan;XIANG Yu(Anhui Port and Shipping Construction Investment Group Co.,Ltd.,Hefei 230601,China;CCCC Second Harbor Consultants Co.,Ltd.,Wuhan 430071,China;Anhui Shui an Construction Group Co.,Ltd.,Hefei 230601,China)
出处 《水运工程》 北大核心 2022年第11期197-201,221,共6页 Port & Waterway Engineering
关键词 船闸工程 钢筋算量 REVIT 二次开发 建筑信息模型 ship lock project reinforcement calculation Revit secondary development building information modeling
  • 相关文献

参考文献4

二级参考文献26

共引文献25

同被引文献43

引证文献5

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部