摘要
为进一步解决以往淤泥土质地基加固工作中的技术性难题,基于某道路建设工程案例,针对该工程所面临的淤泥土软基问题,根据整体施工作业流程,从多个角度入手,全面探讨了高压旋喷桩在淤泥土软基加固工程中的应用技术要点,以及应用过程中的一些注意事项。经过质量检查表明,本次施工取得了初步成功,能够为今后的相关工程作业提供一定的参考借鉴。
In order to further solve the technical problems in the previous silt soil foundation reinforcement work,based on a road construction project case,this study comprehensively discusses the application technical points of high-pressure jet grouting pile in the silt soil soft foundation reinforcement project and some precautions in the application process according to the overall construction process and from multiple angles.The quality inspection shows that the construction has achieved preliminary success,which can provide some reference for future related engineering operations.
出处
《建筑技术开发》
2022年第20期169-171,共3页
Building Technology Development
关键词
淤泥土
地基加固
高压旋喷桩
silt soil
foundation reinforcement
high pressure jet grouting pile