摘要 结合昆明市南二环石虎关立交桥至大观河桥段高架桥提升改造工程,针对城市高架快速路梁板拆除及安装施工,重点叙述了钢板组合梁桥吊装法施工工艺及顺序,介绍了钢板组合梁现浇桥面板施工要点,并且形成成熟的施工工艺,可为类似工程项目提供实践经验。 Combined with the upgrading and reconstruction project of the viaduct from the Shihuguan overpass on the south second ring road in Kunming to the Daguanhe bridge,in view of the demolition and installation of the girder slab of the urban elevated expressway,the construction technology and sequence of the hoisting method of the steel plate composite girder bridge are emphatically described,and a brief introduction is made.The construction points of steel plate composite girder cast-in-situ bridge deck and mature construction technology are formed,which can provide practical experience for similar engineering projects.
作者 刘国强 陈雅南 鞠新强 Liu Guo-qiang;Chen Ya-nan;Ju Xin-qiang
出处 《建筑技术开发》 2022年第19期40-43,共4页 Building Technology Development
关键词 改造工程 钢板组合梁桥 现浇桥面板 吊装法 reconstruction project steel plate composite girder bridge cast-in-place bridge deck hoisting method
  • 相关文献

参考文献2

二级参考文献7

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部