摘要
以深圳市体育场改造提升工程为例,为保证桩基施工过程中避免对原有结构造成破损以及承载力的不利影响,针对性地对旋挖灌注桩、静压预应力管桩这2种施工方法进行了方案优化。通过标准化施工工艺,进行流程化管控、验收,以确保桩基工程施工满足设计要求,并通过桩基工程的检测工作,确保本工程桩基施工安全、有序。
Taking the renovation and upgrading project of Shenzhen Stadium as an example, in order to avoid damage to the original structure and adverse impact on the bearing capacity during the construction of pile foundation, two construction methods, namely rotary excavating cast-in-place pile and static pressure prestressed pipe pile, are optimized. Through standardized construction technology, the process control and acceptance are carried out to ensure that the pile foundation construction meets the design requirements, and the pile foundation construction of this project is safe and orderly through the detection of the pile foundation project.
作者
丁晓春
王坚候
鲁世明
DING Xiaochun;WANG Jianhou;LU Shiming(Shenzhen Construction Engineering Quality and Safety Supervision Station,Shenzhen,Guangdong 518000,China;China Construction Third Engineering Bureau,Shenzhen,Guangdong 518000,China)
出处
《建筑施工》
2022年第10期2523-2525,共3页
Building Construction
关键词
体育场
桩基工程
智能监测
施工管理
stadium
pile foundation works
intelligent monitoring
construction management