在当前我国大力推进装配式建筑的背景下,有效控制成本至关重要。通过对装配式建筑设计、构件生产运输及施工安装、项目运营维护和拆除回收阶段的引起增量成本的要素进行探究,总结现阶段全寿命周期内的增量成本影响要素并对其展开分析,提出针对性的对策建议,希望为装配式建筑全寿命周期成本管控提供参考。
Under the background of vigorously promoting prefabricated buildings in China,how to control the cost has become a crucial research content.Through the exploration of the cost influencing factors in the stages of prefabricated building design,component production and transportation,construction and installation,project operation and maintenance,demolition and recovery,the paper summarizes and analyzes the cost increase elements in the whole life cycle of the current stage,and proposes countermeasures and suggestions,hopes to provide reference for the cost control of prefabricated buildings in the whole life cycle.
作者
赵亮
李思贤
滕俊杰
ZHAO Liang;LI Sixian;TENG Junjie(School of Civil Engineering,Shenyang Jianzhu University,Shenyang 110168,China)
出处
《建筑经济》
北大核心
2022年第11期98-104,共7页
Construction Economy
关键词
装配式建筑
现浇式建筑
增量成本
全寿命周期
prefabricated buildings
cast in situ building
increment cost
the whole life cycle