期刊文献+

装配式建筑全寿命周期增量成本影响因素及控制对策 被引量:9

Influencing Factors and Control Countermeasures of Cost Analysis of Prefabricated Buildings Based on the Whole Life Cycle
下载PDF
导出
摘要 在当前我国大力推进装配式建筑的背景下,有效控制成本至关重要。通过对装配式建筑设计、构件生产运输及施工安装、项目运营维护和拆除回收阶段的引起增量成本的要素进行探究,总结现阶段全寿命周期内的增量成本影响要素并对其展开分析,提出针对性的对策建议,希望为装配式建筑全寿命周期成本管控提供参考。 Under the background of vigorously promoting prefabricated buildings in China,how to control the cost has become a crucial research content.Through the exploration of the cost influencing factors in the stages of prefabricated building design,component production and transportation,construction and installation,project operation and maintenance,demolition and recovery,the paper summarizes and analyzes the cost increase elements in the whole life cycle of the current stage,and proposes countermeasures and suggestions,hopes to provide reference for the cost control of prefabricated buildings in the whole life cycle.
作者 赵亮 李思贤 滕俊杰 ZHAO Liang;LI Sixian;TENG Junjie(School of Civil Engineering,Shenyang Jianzhu University,Shenyang 110168,China)
出处 《建筑经济》 北大核心 2022年第11期98-104,共7页 Construction Economy
关键词 装配式建筑 现浇式建筑 增量成本 全寿命周期 prefabricated buildings cast in situ building increment cost the whole life cycle
  • 相关文献

参考文献4

二级参考文献16

共引文献71

同被引文献49

引证文献9

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部