期刊文献+

广东阳江抽水蓄能电站发电电动机特点

Characteristics of generator motor in Guangdong Yangjiang Pumped Storage Power Station
下载PDF
导出
摘要 阳江抽水蓄能电站发电电动机机组单机容量中国排名第一,全球排名第三,在招标设计特别规定及合同执行过程中,从发电电动机设备参数、结构、设计难点等方面介绍其特点,并从安装过程中遇到的问题进行分析并提供后续建议,可供高转速、大容量发电电动机组招标、制造参考。 The unit capacity of generator motor unit of Yangjiang Pumped Storage Power Station has the first place in China National Ranking,and the third place in the World International Raning.During the bidding design special provisions and contract execution,the characteristics of the generator motor are introduced from the aspects of equipment parameters,structure,design difficulties,etc.,and the problems encountered in the installation process are analyzed and subsequent suggestions are provided,which can be used as reference for bidding and manufacturing of high speed and large capacity generator motor units.
作者 石良 魏炳漳 彭潜 何少润 刘涛 刘韬 SHI Liang;WEI Bing-zhang;PENG Qian;HE Shao-run;LIU Tao;LIU Tao(Guangdong Hydropower Planning&Design Institute Co.,Ltd.,Guangzhou,510635,China;CSG Power Generation Co.,Ltd.,Guangzhou,510000,China)
出处 《水电站机电技术》 2022年第11期12-15,179,共5页 Mechanical & Electrical Technique of Hydropower Station
关键词 阳蓄 设计制造难度 招标 发电电动机 Yangjiang Pumped Storage Power Station design and manufacturing difficulty bidding generating motor design and manufacturing difficulties problems encountered during installation and subsequent suggestions
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部