期刊文献+

新形势下的大型火力发电机组生产准备工作探索

Production Preparation of Large Thermal Power Generating Units under the New Situation
下载PDF
导出
摘要 火力发电机组生产准备工作必须遵循“站在生产的角度搞好基建,以基建达标的要求落实生产”的原则,重视过程控制和风险预控,精心组织,做好监督激励,使生产准备全员、全方位、全过程深度参与,确保在工程项目转入商业运营的同时,生产人员业务技能水平、设备健康水平和现场安全文明生产水平等各方面同时达到安全环保经济运行要求,实现机组即投产、即安全、即达标、即盈利的目标。介绍了大型火力发电机组生产准备工作的重要意义,阐述了生产准备各阶段的主要工作目标,总结了生产准备工作的经验做法,对于其他新建火力发电机组生产准备工作具有一定的借鉴意义。 The production preparation of thermal power generating units must follow the principle of"improving infrastructure from the perspective of production,implementing production with the requirements of infrastructure standards",attaching importance to process control and risk pre-control,carefully organizing and supervising to motivate,so as to make the production preparation with full,all-round and full-process participation,and ensure that the production personnel's business skill level,equipment health level,and production level can be improved while the project is transferred to commercial operation.At the same time,the level of production personnel's business skills,equipment health level and site safety and civilized production level will meet the requirements of safety,environmental protection and economic operation,so as to achieve the goal of commissioning,safety,compliance and profitability of the unit.It introduces the importance of production preparation for large thermal power generating units,explains the main objectives of each stage of production preparation,and summarizes the experience and practice of production preparation,which is of certain reference significance for the production preparation of other new thermal power generating units.
作者 郭启存 Guo Qicun(China Coal Pingshuo AntaIbao Cogeneration Co.,Ltd.,Shuozhou Shanxi 038500)
出处 《现代工业经济和信息化》 2022年第10期271-273,共3页 Modern Industrial Economy and Informationization
关键词 火力发电机组 生产准备 基建 production preparation large thermal power generating units infrastructure
  • 相关文献

参考文献2

二级参考文献7

  • 1张家柱.监理过程中的跟踪检测和平行检测[J].江淮水利科技,2009(5):22-23. 被引量:4
  • 2刘泽双.人力资源管理[M]大连:东北财经大学出版社,2009.
  • 3崔树银;里降临.现代发电企业管理[M]北京:中国电力出版社,2009.
  • 4姜真.现代企业管理[M]北京:清华大学出版社,2007.
  • 5李广泰.生产现场管控[M]深圳:海天出版社,2005(6).
  • 6胡永宏.综合评价方法[M]北京:科学出版社,2000.
  • 7姚小刚.建筑生产系统危险性分析、评价与安全管理的研究[D]上海:同济大学,2001(9).

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部