期刊文献+

“外悬臂+内台车”组合钢模体系在大型渡槽后浇带施工中的应用 被引量:3

Application of“Outer Cantilever+Inner Trolley”Combined Steel Formwork System in the Construction of Large Aqueduct Post-cast Strip
下载PDF
导出
摘要 大型渡槽后浇带采用“外悬臂+内台车”组合钢模体系进行模板安装,规避了传统施工技术需在结构过水断面设置穿墙拉杆进行模板对拉而影响结构抗渗性的弊端,有效解决了预埋件难以精准定位和加固的问题,简化了模板安装工序,提升了模板周转使用率与渡槽后浇带施工效率,降低了施工成本,保证了工程施工质量,可在类似工程中应用推广。 The post-cast strip of the large aqueduct adopts the“outer cantilever+inner trolley”combined steel formwork system for formwork installation.It avoids the drawbacks of traditional construction technology that need to set through-wall tie rods on the water-passing section of the structure to pull the formwork and affect the impermeability of the structure,effectively solves the problem that the embedded parts are difficult to accurately locate and reinforce,simplifies formwork installation procedure and greatly improves the utilization rate of formwork turnover.This can be applied and promoted in similar projects.
作者 杨鹏 YANG Peng(The Guangdong No.3 Water Conservancy and Hydro-electric Engineering Board Co.,Ltd.,Dongguan 523710,China)
出处 《广东水利水电》 2022年第11期71-74,79,共5页 Guangdong Water Resources and Hydropower
关键词 大型渡槽后浇带 “外悬臂+内台车” 组合钢模体系 模板安装与拆卸 large-scale aqueduct post-cast strip the combination of“outer cantilever and inner trolley”steel formwork system formwork installation and removal
  • 相关文献

参考文献9

二级参考文献38

共引文献46

同被引文献20

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部