ASP水箱为华龙一号三代核电新增非能动不锈钢水箱,内衬为超大环形不锈钢覆面,基于ASP水箱结构形式,采用模块化车间预制、现场分模块吊装就位的施工工艺,减小现场作业难度,提升安装质量。防城港二期核岛土建工程的成功应用,证明了ASP水箱模块化施工技术的可行性,不仅达到了预期目的,同时形成了车间的流水化、模块化作业,大量节省了ASP水箱现场安装时间。
The ASP water tank is a new non-energy stainless steel water tank for Hualong One Generation III nuclear power,lined with a large ring-shaped stainless steel cladding.Based on the structural form of the ASP water tank,the construction process of modular workshop prefabrication and on-site sub-module lifting in place was adopted to reduce the difficulty of on-site operations and improve the quality of installation.The successful application of the civil construction project of Fangchenggang II nuclear island has proved the feasibility of the modular construction technology of the ASP water tank,which not only achieved the expected purpose,but also formed the flowing modular operation of the workshop,saving a lot of time for the on-site installation of the ASP water tank.
作者
李光远
栗建博
刘军
李波
李斌
史宏汝
LI Guangyuan;LI Jianbo;LIU Jun;LI Bo;LI Bin;SHI Hongru(China Construction Second Engineering Bureau Co.,Ltd.,Beijing 100160,China)
出处
《施工技术(中英文)》
CAS
2022年第22期50-55,共6页
Construction Technology
基金
中建股份科技研发课题:防城港国际示范堆“华龙一号”核电站施工技术研究(CSCEC-2017-Z-23)
中建股份科技研发课题:核岛钢结构自动、半自动焊接施工创新技术研究(CSCEC-2020-Z-53)。
关键词
核电站
ASP水箱
模块化
施工
吊装
nuclear power plant
ASP water tank
modularization
construction
hoisting