期刊文献+

一种不停电投运10 kV开关站的方法

An Approach for Putting 10 kV Switchyard into Operation Without Power-cut
下载PDF
导出
摘要 根据城镇配电网不停电检修需要,结合现有的不停电作业方法,提出了一种利用现有线路网架、在配电线路和用户均不停电的同时实现10 kV开关站投运的方法,实践证明这种不停电投运10 kV开关站的方法能够满足配电网安全、高效检修的要求。 According to the requirements of overhaul without power-cut for urban power distribution grids,an approach,combined with the current operation approach with power uninterrupted,is put forward to operate 10 kV switchyards without power-cut both in the distribution lines and power users based on the current operating power lines,which is verified compliable with the safety and efficient overhaul needs of distribution grids.
作者 徐勇 梁加凯 何小乓 项锡敏 金乾峰 XU Yong;LIANG Jiakai;HE Xiaopang;XIANG Ximin;JIN Qianfeng(Jinhua Power Supply Company,Ltd.,Jinhua 321000)
出处 《电力安全技术》 2022年第11期48-50,共3页 Electric Safety Technology
关键词 城镇配电网 10 kV开关站 升级改造 不停电作业 urban power distribution grid 10 kV switchyard upgrade and overhaul operation without powercut
  • 相关文献

参考文献2

二级参考文献5

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部