摘要
以上海电气塞尔维亚潘切沃燃气联合电站项目为背景,根据项目风险管理流程,识别、分析电站项目调试期间的风险因素,规划风险应对,实施风险应对,在项目全过程中进行风险监督。
Taking Shanghai Electric Serbia Pancevo Gas Combined Power Station project as the background,according to the project risk management process,identify and analyze the risk factors during the commissioning,plan the risk response,implement the risk response,and conduct risk supervision in the whole process of the project.
作者
贤建伟
XIAN Jian-wei(Shanghai Electric Wind Power Group,Shanghai 200233,China)
出处
《工程建设与设计》
2022年第21期232-235,共4页
Construction & Design for Engineering
关键词
海外
电站项目
调试
风险管理
oversea
power station project
commissioning
risk management