北京电力隧道矩形顶管通用断面设计 被引量:2

General section design of Beijing electric power rectangular pipe jacking
下载PDF
导出
摘要 结合北京电力隧道其他工法常用断面,考虑隧道内电缆敷设、运维检修、附属设施、结构安全、顶管机械等因素,依据北京电力隧道的埋深及水文地质等条件,采用理论计算与数值模拟的手段分析了矩形顶管的受力与变形,并确定了矩形顶管断面的形式、净空尺寸、结构受力及关节长度等关键参数,为评判电力矩形顶管技术的可行性提供依据,并且有利于电力矩形顶管隧道断面的设计。 In this paper,combined with the common sections of other construction methods of Beijing power tunnel,considering the factors such as cable laying,operation and maintenance,auxiliary facilities,structural safety and pipe jacking machinery in the tunnel,and according to the buried depth and hydrogeological conditions of Beijing power tunnel,the stress and deformation of rectangular pipe jacking are analyzed by means of theoretical calculation and numerical simulation,and the form of rectangular pipe jacking section is determined the key parameters such as clearance size,structural stress and joint length provide a basis for judging the feasibility of power rectangular pipe jacking technology.It is beneficial to the design of electric rectangular pipe jacking tunnel section design of power rectangular pipe jacking tunnel.
作者 李继波 黄业胜 张小颖 Li Jibo;Huang Yesheng;Zhang Xiaoying(State Grid Bejjing Economics Research Institute Co.,Ltd.,Beijing 100020,China)
出处 《山西建筑》 2022年第24期155-157,共3页 Shanxi Architecture
关键词 矩形顶管 电力隧道 断面设计 rectangular pipe jacking power tunnel cross section design
  • 相关文献

参考文献4

二级参考文献38

共引文献35

同被引文献12

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部