摘要 2019年以来,某风电场多次发生35kV汇集线路单相接地故障后,升压站内400V侧电气设备损坏事件,此类事件对风电场日常运行带来极大的困扰。本文根据接地变工作原理,结合故障时刻的录波文件等对事件进行了分析,得出了400V侧电气设备损坏的直接原因及根本原因,并提出了解决措施,最终将该问题彻底解决。 Since 2019,after a single-phase grounding fault of a 35kV convergence line occurred repeatedly in a wind farm,damage to electrical equipment on the 400V side of the transformer substation,such incidents have caused great distress to the daily operation of wind farms.This article works according to the grounding transformer,the events are analyzed in conjunction with the recording fi le at the time of failure,the direct cause and root cause of the damage to the electrical equipment on the 400V side were obtained,and proposed a solution.Finally,the problem was solved completely.
作者 董明 魏振军 王喜 赵映泽 DONG Ming;WEI Zhenjun;WANG Xi;Zhao Yingze(Hebei Longyuan Wind Power Co.,Ltd.,Chengde 067000)
出处 《风力发电》 2022年第4期48-52,共5页 Wind Power
关键词 接地变 单相接地 零序电压 零序磁通 Grounding transformer Single-phase groundingl Zero-sequence voltage Zero-sequence magnetic flux
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部