大跨度双塔斜拉桥悬拼安装施工工艺

Cantilever Assembly Construction Technology of Long-span Double-pylon Cable-stayed Bridge
下载PDF
导出
摘要 工程主桥中跨安装为大跨度悬拼安装作业,施工场地上跨黄河,为保证该区域顺利施工,采用桥面吊机吊装加斜拉索张拉同步施工的施工工艺进行安装。主要对其施工技术进行阐述,对类似工程项目的施工具有一定的指导意义。 The middle span of the main bridge in a project belongs to the long-span cantilever assembly installation work.The construction site will span Huanghe River.In order to guarantee the smooth construction in this area,the construction process of the deck hoisting plus the stayed cable tension synchronously is used for installation.The construction technologies are mainly set forth,which has certain guiding significance for the construction of the similar engineering projects.
作者 隗会军 武德智 胡元峰 陈文强 曹有名 WEI Huijun;WU Dezhi;HU Yuanfeng;CHEN Wenqiang;CAO Youming
出处 《城市道桥与防洪》 2022年第11期161-163,I0016,共4页 Urban Roads Bridges & Flood Control
关键词 大跨度悬拼 双塔斜拉 桥面吊机 斜拉索张拉 施工工艺 long-span cantilever assembly double-pylon cable-stayed deck hoist stayed cable tension construction technology
  • 相关文献

参考文献2

二级参考文献3

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部