摘要
The Wuhan intelligent connected vehicle(ICV)test site,constructed by China Construction Second Engineering Bureau,was fully completed on Aug.5 and is expected to be officially operational in January of next year.The test site is located by the Dongjing River in Wuhan Economic and Technological Development Zone.