期刊文献+

基于BIM的物业隐蔽工程显化处理方法 被引量:1

BIM-Based Visualization Approach of Concealed Engineering in Buildings
下载PDF
导出
摘要 针对物业运营与使用阶段,因隐蔽工程难以准确定位而引发的财产、经济损失及触电伤害等问题,提出了隐蔽工程显化处理的概念;同时,以BIM模型为数据支撑,结合二维码技术及移动互联网技术,提出了基于BIM技术的物业隐蔽工程显化处理方法,解决了物业隐蔽工程定位难、数据难再现等问题,避免了由此引发的各类财产、经济和人身损害,为物业运维管理及业主的日常使用提供了便利。 Accurately locating the position of the concealed project in the operation and management stage of the property is a challenge,and some loss of property and incidents of electric shock may occur in the locating process.The visualization of concealed engineering in buildings is proposed.This paper provides a solution and develops a method to solve the above problems by integrating BIM technology,QR code technology,and mobile internet technology.A new solution for the concealment of the property based on BIM technology is proposed.The new approach could properly solve the locating difficulty and related data visualization issue,which could help avoid the economic losses and damages caused by poor locating of unseen.The new approach will benefit the owners of residences,and also bring great convenience during the operation and maintenance management of the property.
作者 施继余 胡瑛 张玮 SHI Jiyu;HU Ying;ZHANG Wei(Faculty of Architectural Engineering,Kunming Metallurgy College,Kunming 650033,China)
出处 《昆明冶金高等专科学校学报》 CAS 2022年第4期79-84,共6页 Journal of Kunming Metallurgy College
基金 昆明冶金高等专科学校科研基金项目:“互联网+”背景下物业管理专业人才培养与市场需求衔接研究(2019XJSK08)。
关键词 BIM技术 物业 隐藏工程 显化处理 BIM property concealed project visualization
  • 相关文献

参考文献5

二级参考文献27

  • 1Babie NC, Podbreznik P, Rebolj D. Integrating resourc.e production and construction using BIM[J]. Autom Constr, 2010,19(5 ):539-543.
  • 2Sacks R, Treckmann M, Rozenfeld O. Visualization of work flow to support lean construction[J]. J Constr Eng Man- age,2009,135(12) : 1307-1315.
  • 3Sacks R, Radosavljevic M, Barak R. Requirements for building information mudeling based lean production man- agement systems for construction[J]. Autom Constr,2010, 19 (5) :641-655.
  • 4Singh V, Gu N, Wang X. A theoretical fiamework of a BIM-based muhi-diseiplinary collaboration platform [J]. Aurora Constr,2011,20(2):134-144.
  • 5Arayici Y, Coates P, Koskela L, et al. Technology adop- tion in the BIM implementation for lean architectural practiee[J]. Aurora Constr,2011,20(2): 189-195.
  • 6Sacks R, Koskela L, Dave BA, et al. Interaction of lean and building information modeling in construction[J]. J Constr Eng Manage, 2010, 136 (9) :968-980.
  • 7Clarke JA, Johnstone CM, Kelly NJ, et al. The role of built environment energy efficiency in a sustainable UK energy economy[J]. Energy Policy,2008,36(12):4605-4609.
  • 8胡硕兵.建筑智能化系统运维管理探讨[J].智能建筑,2010(1):47-49. 被引量:5
  • 9王凌峰.日本物流信息化的启示[J].信息网络,2010(7):65-67. 被引量:2
  • 10潘怡冰,陆鑫,黄晴.基于BIM的大型项目群信息集成管理研究[J].建筑经济,2012,33(3):41-43. 被引量:25

共引文献78

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部