期刊文献+

京杭运河沟通钱塘江八堡船闸口门综合整治方案 被引量:1

Comprehensive regulation scheme for entrance area of Babao ship lock connecting Grand Canal and Qiantang River
下载PDF
导出
摘要 京杭运河沟通钱塘江八堡船闸出口位于七堡弯道强潮河段,水流泥沙条件极其复杂。为满足通航要求,需要采取综合整治措施。针对河势变化、航槽水深、通航水流条件、闸下引航道泥沙淤积、出口通航保证率等问题,采用河床演变分析、潮流泥沙数学模型计算、物理模型试验、船模及实船航行试验等综合方法和手段进行深入研究,验证了船闸出口河段岸滩综合整治方案。结果表明:通过清理残坝、缩短丁坝长度以及增建导航堤等工程措施,促使航道主槽靠近船闸出口,显著提高口门区通航保证率,闸下引航道和口门区泥沙淤积量在可控范围。 The exit of the Babao ship lock connecting the Grand Canal and Qiantang River is located in the strong tidal bore reach of the Qibao bend,where the water flow and sediment conditions are extremely complex.Comprehensive regulation measures should be taken to meet the navigation requirements.In view of the river regime change,channel depth,flow conditions for navigation,sediment deposition in the downstream approach channel of the ship lock,and the navigation assurance rate at the exit of the lock,comprehensive methods and means are applied for an in-depth study,including the riverbed evolution analysis,mathematical model calculation of tidal flow and sediment,physical model test,and ship model and vessel maneuvering test.The comprehensive regulation scheme for the beach at the exit of the lock is verified.The results show that by clearing the residual dam,shortening the length of spur dikes,adding navigation dikes,and other engineering measures,we can make the main channel close to the exit of the ship lock,significantly improve the navigation assurance rate of the entrance area,and ensure that the sediment deposition in the downstream approach channel of the ship lock and the entrance area is within the controllable range.
作者 金国强 史英标 李浙江 杨元平 范大林 JIN Guo-qiang;SHI Ying-biao;LI Zhe-jiang;YANG Yuan-ping;FAN Da-lin(Zhejiang Institute of Communications Co.,Ltd.,Hangzhou 310030,China;Zhejiang Institute of Marine Planing and Design,Zhejiang Institute of Hydraulics&Estuary,Hangzhou 310016,China)
出处 《水运工程》 北大核心 2022年第12期98-105,共8页 Port & Waterway Engineering
基金 浙江省交通厅科技计划资助项目(2021026)。
关键词 八堡船闸 整治方案 导航堤 通航保证率 防洪影响 Babao ship lock regulation scheme navigation embankment navigation assurance rate flood control impact
  • 相关文献

参考文献6

二级参考文献15

  • 1胡旭跃,李彪,徐立君.水利枢纽通航水流条件研究综述[J].水运工程,2005(11):59-64. 被引量:29
  • 2谭先泽,郝岭,吴文凤.山区河流船闸引航道布置型式[J].水运工程,2006(4):69-72. 被引量:5
  • 3张瑞瑾.河流泥沙动力学[M].北京:中国水利水电出版社,1983.
  • 4交通部三峡办公室.长江三峡工程泥沙和航运问题研究成果汇编(1)[R].北京:交通部三峡办公室,1997..
  • 5中国长江三峡工程开发总公司技术委员会,国务院三峡工程建设委员会办公室泥沙课题专家组.长江三峡工程坝区泥沙研究报告集[R].(第一卷).北京:专利文献出版社,1997.
  • 6中国长江三峡工程开发总公司技术委员会,国务院三峡工程建设委员会办公室泥沙课题专家组.长江三峡工程坝区泥沙研究报告集[R].(第二卷).北京:专利文献出版社,1997.
  • 7史英标,杨元平,程文龙,等.京杭运河浙江段三级航道整治工程八堡口门关键技术问题研究[R].杭州:浙江省水利河口研究院,2009.
  • 8史英标.钱塘江河口造床过程的全耦合水沙数学模型研究[R].杭州:浙江省水利河口研究院,2009.
  • 9熊绍隆.潮汐河口泥沙物理模型设计方法[J]水动力学研究与进展(A辑),1995(04).
  • 10重庆交通大学.潇湘枢纽船闸改建工程整体水工模型试验研究报告[R].重庆:重庆交通大学,2009.