期刊文献+

沉管隧道最终接头止水带安装工艺 被引量:1

Installation technology for final joint water-stop of immersed tube tunnel
下载PDF
导出
摘要 最终接头止水工艺的效果决定了最终接头工艺的成败。通过研究大连湾海底隧道工程隧道最终接头模型试验、最终接头结构形式、止水构造、止水构造安装工艺和止水构造保护措施,探索出新型最终接头止水带安装工艺及保护措施,分析了止水带安装操作优缺点,在总结施工经验的基础上优化了施工工艺。通过模拟安装验证了此止水带安装工艺及保护措施的可行性,同时也证明了在高纬度寒冷地区,此种安装工艺和保护措施具有良好的可实施性和易操作性,可为后续类似工程施工提供参考和借鉴。 The effect of the final joint sealing process determines the success or failure of the final joint process.By studying the final joint model test,final joint structure,water-stop structure,water-stop structure installation process and water-stop structure protection measures of Dalian Bay Subsea Tunnel project,the installation process and protection measures of new final joint water-stop are explored,the advantages and disadvantages of water-stop installation operation are analyzed,and the construction process on the basis of summarizing construction experience is optimized.The feasibility of the installation process and protective measures of this water-stop is verified through simulation installation,and it is also proved that this installation process and protective measures are feasible and easy to operate in high latitude cold regions,which can provide reference for subsequent similar projects.
作者 付洪超 姚延焕 FU Hong-chao;YAO Yan-huan(No.2 Engineering Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Qingdao,Shandong 266071,China;CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300461;Tianjin Key Laboratory of Construction,Operation and Maintenance Technologies for Underwater Tunnels,Tianjin 300461,China)
出处 《中国港湾建设》 2022年第12期121-125,共5页 China Harbour Engineering
关键词 沉管隧道 安装工艺 可伸缩止水带 可注浆止水带 最终接头 immersed tube tunnel installation process retractable water-stop grouting water-stop final joint
  • 相关文献

参考文献8

二级参考文献29

共引文献29

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部