摘要
工程进度控制是工程建设项目目标控制之一,论文以市政工程项目为例,创造性地提出并分析计算了工程进度控制网络计划中快速寻求关键线路的方法——断路法,并对比叙述了常用的标号法局限性。通过对断路法原理和特点的介绍,并结合实际工作中遇到的市政工程项目进度控制网络计划计算分析,更好地帮助工程师在以后的工作中快速便捷确定工程网络计划关键线路、关键工作和工期,从而为进一步进行项目工期优化做好铺垫。
Project progress control is one of the objective control of engineering construction projects.Taking municipal engineering projects as an example,this paper creatively puts forward,analyzes and calculates the method of quickly finding the key line in the project progress control network plan-breaking method,and compares and describes the limitations of the commonly used label method.Through the introduction of the principle and characteristics of breaking method,and combined with the calculation and analysis of the municipal engineering project schedule control network plan encountered in the actual work,it can better help the engineers quickly and conveniently determine the key route,key work and construction period of the engineering network plan in the future work,so as to pave the way for the further optimization of the project construction period.
作者
邢远
XING Yuan(Jiangsu Renhezhonghui Engineering Consulting Co.,Ltd.,Suzhou Jiangsu 215000,China)
出处
《工程质量》
2022年第12期39-42,共4页
Construction Quality
关键词
进度控制
关键线路
快速寻求
断路法
progress control
key route
quick seek
breaking method