明渠渠堤土方填筑碾压试验 被引量:2

Roller compaction test of open canal dike earth filling
下载PDF
导出
摘要 通过宁明干渠工程小满隧洞出口明渠段工程实例,介绍了明渠渠堤土方填筑施工试验,包括前期试验场地与用料的选择,碾压试验技术指标,试验参数的选择等。阐述了现场碾压试验的全过程以及施工参数确定的方法,并对试验参数进行了分析。 Xiao man tunnel is one of the components of Ningming trunk canal.Taking the open canal section at the outlet of Xiaoman tunnel as example, an introduction was made on the earth filling construction test for open canal dike, including the selection of testing sites and materials, the technical indexes and testing parameters of roller compaction test. The authors also present the whole process of field roller compaction test and the determination method of construction parameters, and analyze the testing parameters.
作者 李艳梅 苏兴彬 陆世权 吕冠成 LI Yan-mei;SU Xing-bin;LU Shi-quan;LV Guan-cheng(Zuojiang River Drought Control Project Management Center,Chongzuo 532200,China)
出处 《广西水利水电》 2022年第6期15-16,21,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 明渠渠堤 土方填筑 碾压试验 参数 成果分析 Open canal dike earth filling roller compaction test parameter analysis of results
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部