摘要
水电工程土建施工招标计量支付条款是长期困扰水电建设管理的难题,在招标文件编制与审查中涉及计量支付条款、花费时间和精力多的问题,现场管理中计量支付争议多和管控难。为解决这一难题,探索编制和推广应用水电工程土建施工招标计量支付条款企业规范,并针对水电建设实际中存在计量支付的疑难问题,在总结吸取以往经验教训的基础上经仔细研究,采取了综合的相对较优的一些改进创新措施,从而初步形成了一套适宜公司自身管理需求的水电工程土建施工招标计量支付条款企业规范。经在多个大型水电工程建设招标及项目管理中试用,大幅提高了招标文件编制与审查的质量和效率,统一和规范了计量支付管理,取得了很好的效果。
Measurement and payment terms for civil construction bidding of hydropower projects have been a tough issue for hydropower construction management for a long time.In the compilation and review of bidding documents,many problems are involved in measurement payment terms,which cost plenty of time and efforts.In the on-site management,there are also many disputes and control difficulties in measurement and payment.To reach a solution of this problem,enterprise specifications for the measurement and payment terms in bidding of civil construction of hydropower engineering are established and popularized.Meanwhile,aiming at the actual measurement and payment problems and on the basis of summarizing and studying the learned lessons,optimal comprehensive improvement innovation measures are carried out.Eventually,a set of enterprise specifications for the measurement and payment terms in bidding of civil construction of hydropower engineering suitable for the company’s own management needs is preliminarily formed.Through the trails in the bidding and project management of several large hydropower projects,the practice has proved that the quality and efficiency of the bidding document preparation and review are greatly improved,and the measurement and payment management is unified and standardized,and good results are achieved.
作者
吴述国
胡海浪
WU Shuguo;HU Hailang(Guoneng Dadu River Drainage Area Hydroelectricity Development Co.,Ltd.,Chengdu Sichuan 610041)
出处
《四川水力发电》
2022年第6期116-119,124,共5页
Sichuan Hydropower
关键词
水电工程
建设管理
工程招标
计量支付
企业规范
Hydropower project
Construction management
Project bidding
Measurement and payment
Enterprise standard