摘要 厦门第二东通道工程海中段桥梁上、下部结构均采用预制装配化方案,上部主梁采用90 m/150 m两类跨径的连续钢箱梁,桥面宽37 m。对海中段桥梁上部结构的方案选型和构造设计进行分析,如腹板及加劲板构造、正交异性桥面板构造及现场连接方式设计等进行了详细分析,可为同类型桥梁的设计提供参考。 The superstructure and substructure of the marine bridge of Xiamen Second East Passage Project adopt the prefabrication and assembly-in-situ solution. The main girders are continuous steel box beams with two types of span length 90 m/150 m, and the bridge deck is 37 meters wide. In the paper, the scheme comparisons and structure design of marine bridge superstructure are analyzed in terms of web and stiffening plate structure, orthotropic bridge deck structure and field connection design, which can provides reference for design of the same type bridges.
作者 陈鹏 张龙 文锋 CHENPeng;ZHANG Long;WEN Feng(CCCC Second Harbour Engineering Company Ltd.,Wuhan 430040,China;CCCC Highway Consultants Co.Ltd.,Beijing 100010,China;School of Highway,Chang’an University,Xi’an 710064,China)
出处 《公路》 北大核心 2022年第11期28-31,共4页 Highway
关键词 厦门第二东通道工程 大跨连续钢箱梁 方案比选 结构设计 Xiamen Second East Passageway Project large-span continuous steel box girder scheme comparison and selection structural design
  • 相关文献

参考文献2

二级参考文献12

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部