摘要
螺栓球网架施工精度要求高,安全保证措施要求严格。该文结合某项目屋面钢网架施工,总结出了螺栓球网架起步基本单元在地面分片组装、分片吊装、空中对接、整体落位后,再进行高空散拼安装的施工技术及相应安全保证措施,可为类似工程施工提供参考。
The construction of bolt ball grid frame calls for high accuracy,and strict safety assurance measures.Combined with the steel grid frame construction of the roof of a project,this paper laid out the construction technologies of the starting basic unit of a bolt ball grid frame,including ground fragment assembly,fragment hoisting,aerial docking,integral placement,and then high-altitude scattered assembly,which can provide reference for similar engineering construction.
作者
于海祥
左相飞
李治强
Yu Haixiang;Zuo Xiangfei;Li Zhiqiang
出处
《重庆建筑》
2022年第12期45-47,61,共4页
Chongqing Architecture
关键词
螺栓球钢网架
起步基本单元吊装
高空散拼
施工方法
bolt ball steel grid frame
starting basic unit hoisting
high-altitude scattered assembly
construction methods